CITY OF FARGO BIDS WANTED CELL 20 CONSTR - InForum | Fargo, Moorhead and West Fargo news, weather and sports

2022-05-13 22:43:34 By : Ms. Cynthia Luo

CITY OF FARGO BIDS WANTED CELL 20 CONSTRUCTION PROJECT SW 22-01 Sealed bids will be received at the office of the City Auditor, City Hall, 225 4th Street North, Fargo, North Dakota, until _11:30 AM_, May 18, 2022_, and then opened and read, for Cell 20 Construction, Project SW 22-01 on the following: City of Fargo Cell 20 Construction Bidders are also allowed to place bids in a drop box on the north side of City Hall. Which will require approximately: Excavation (Soils) 261,000 CY Waste Excavation and Relocation 22,000 CY Controlled Fill 28,500 CY Clay Subliner 53,420 SY 60-Mil HDPE Liner 53,420 SY 6-Inch HDPE SDR 11 Pipe 860 LF 18-Inch HDPE SDR 11 Pipe 150 LF 12-Inch Granular Drainage Layer 53,420 SY Riser Vault 1.0 LS Leachate Pumping System 1.0 LS 48-Inch Leachate Manholes 3 EA Standard Storm Sewer Manholes 2 EA 8-Inch PVC SDR 26 Sewer Pipe 560 LF 8-Inch PVC SDR 26 Sewer Pipe HDD 218 LF 2-Inch HDPE SDR 11 Forcemain Pipe 105 LF 12-Inch PVC SDR 35 Culvert 236 LF 12-Inch Corrugated HDPE Culvert 196 LF 12-Inch RCP Culvert 48 LF Concrete Outfall 1 LS 2-Inch Conduit Piping 981 LF Access Road Construction 1,600 LF Bids shall be on the basis of cash payment for work performed. All work included in the contract must be fully completed on or before December 30, 2022____ Bids must be in a sealed envelope plainly marked “Cell 20 Construction Project SW 22-01”, and attached to the outside of the bid envelope must be A SEPARATE ENVELOPE CONTAINING A LIST OF ALL ADDENDA TO THE PLANS AND SPECIFICATIONS AND AN ACKNOWLEDGEMENT BY THE BIDDER OF RECEIPT OF SUCH ADDENDA. THE SEPARATE ENVELOPE SHALL ALSO CONTAIN A CONTRACTORS LICENSE, And A BIDDER’S BOND IN THE AMOUNT OF 5% OF THE FULL AMOUNT OF THE BID executed by the bidder as principal and by a surety, conditioned that if the principal’s bid is accepted and the contract awarded to the principal, the principal, within 10 days after notice of award, shall execute a contract in accordance with the terms of the bid and a contractor’s bond as required by law and the regulations and determinations of the governing body. Countersignature of a bid bond is not required under this section. All bidder’s, except a bidder on a municipal, rural, and industrial water supply project authorized for funding under public law No. 99-294 [100 Stat. 426; 43 U.S.C. 390a], must be licensed for the full amount of the bid, as required by section 43-07-05. A copy of the contractor’s license or certificate of renewal thereof, issued by the secretary of state, must be enclosed in the bid bond envelope as required under section 43-07-12. No bid may be read or considered if it does not fully comply with these requirements and any deficient bid submitted must be resealed and returned to the bidder immediately. Plans and specifications are on file at the Division of Solid Waste, 2301 8th Ave N, Fargo, ND, where any interested person may examine them. Interested parties may also call 701-241-1449. Bidders on this work will be required to comply with Title 40 CFR Part 33– Participation by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women’s Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. To demonstrate a good faith effort to comply, bidders must include the MBE/WBE subcontractor solicitation form in the bid package. Covered Area: Goal (percent) 149 Fargo-Moorhead, ND-MN: Non-SMSA Counties——————————————————-————— 0.7 MN Becker; MN Clay; MN Wilkin; ND Barnes; ND Cass; ND Dickey; ND Eddy; ND Foster; ND Griggs; ND La Moure; ND Logan; ND McIntosh; ND Ransom; ND Richland; ND Sargent; ND Steele; ND Stutsman; ND Trail. The female participation goal is 6.9% for the entire state. Bidders on this work will be required to comply with the President’s Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications. Bidders on this work will be required to comply with American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. Bidding documents may be viewed and ordered online at the QuestCDN website, http://www.questcdn.com (Quest Project #8178271) for a non-refundable payment of $25. Questions regarding the plans and specifications can be directed to Stantec, Inc. at 701-297-9600. The Board of City Commissioners of the City of Fargo, North Dakota, reserves the right to hold all bids for a period of 15 days after the day fixed for the opening of the bids, and the right to reject any or all bids and to waive any formalities. (April 27; May 4 & 11, 2022) 53448